Every task management system I’ve seen treats progress as a property of the task — a percentComplete integer, a status note, maybe a progress bar that someone updates manually. CaseHub’s WorkItem had exactly this: a flat Integer percentComplete and a String statusNote, set via a single REST endpoint. Simple. Wrong.

The problem surfaces the moment you try to answer a real question. “How far along is the fleet deployment?” The deployment has four levels — fleet, datacentres, nodes, components. Each node reports its own progress shape: the calibration step is 3 of 7 sensors done, while the software install is at 62%. Some components appeared after the deployment started. The node’s progress is a tree, not a number. And the fleet’s progress is an aggregate of those trees. A single integer on a WorkItem can’t represent any of this.

The deeper issue is orthogonality. A WorkItem can be DELEGATED — from the engine’s perspective, it’s been handed off — while its internal progress is deeply structured: staged, conditional, partially complete, nested. WorkItem lifecycle and progress state are independent dimensions. Flattening one onto the other loses information that consumers (dashboards, SLA monitors, AI agents, milestone evaluators) actually need.

What we built instead

ProgressInstance is a separate entity, anchored to any scope via scopeType/scopeId — a WorkItem, a PlanItem, a fleet node, anything. Same shape at every level. Parent-child hierarchy via parentProgressId. Three typed shapes cover the real cases: percentage (the simple one), count (N of M with a unit), and step (a forward-only DAG of named steps with dependencies, optional flags, and JQ conditions).

The step shape is where it gets interesting. A step definition declares the dependency graph at creation time:

[
  {"name": "unpack", "optional": false, "dependsOn": []},
  {"name": "assembly", "optional": false, "dependsOn": ["unpack"]},
  {"name": "wiring", "optional": false, "dependsOn": ["unpack"]},
  {"name": "calibration", "optional": false, "dependsOn": ["assembly", "wiring"]},
  {"name": "testing", "optional": true, "dependsOn": ["calibration"],
   "condition": ".steps.calibration.data.passedChecks > 5"}
]

The progress model validates that step transitions are legal — can’t activate a step whose dependencies aren’t met, can’t skip a non-optional step, conditions are gate-checked at activation time. This is data integrity, not control. The orchestrator decides when to advance a step; the progress model validates that the advance is legal per the definition the orchestrator itself declared.

The observation principle

The key design constraint: progress is a choreography observer. It records and reports what happened without controlling execution. The engine decides when to retry a failed step, when to skip ahead, when to fail the whole instance. Progress faithfully represents what those systems are doing — it doesn’t drive them.

This shows up concretely in two asymmetries. Derived completion is automatic: when all required steps are done, the ProgressInstance transitions to COMPLETED — that’s a logical invariant, same as “percentage reaching 100 means done.” But derived failure is not automatic: when a required step fails, the instance stays ACTIVE. The orchestrator observes the failure via a CDI event and decides what to do — retry, skip, escalate. That judgment belongs with the system that understands the domain context, not with a progress recorder.

The looping anchor

The reason ProgressInstance is a separate entity — not just richer fields on WorkItem — comes from iteration. When a PlanItem retries in the engine, each iteration needs its own progress. If progress were a field on WorkItem, retrying overwrites the previous iteration’s state. With separate instances, each iteration is a child:

ProgressInstance (PlanItem repeat root)
  ├── ProgressInstance (iteration 1) — COMPLETED
  ├── ProgressInstance (iteration 2) — ACTIVE, 35%

The parent aggregates via a configurable rollup strategy. The rollup cascade is asynchronous — @ObservesAsync with OCC retry, same pattern as the existing spawn group coordinator. Eventual consistency with a reconciliation sweep as a safety net. Each level commits independently; no transaction spans multiple tree levels.

Rollup across heterogeneous shapes

A count parent can aggregate percentage children. A fleet-level instance uses weighted-percentage rollup while individual nodes use count-completed. The strategy is per-instance, resolved via the platform’s existing StrategyResolver — same convention as agent routing and worker selection. Custom strategies are CDI beans; you pay the complexity only at the levels that need it.

What this opens

The engine integration is the piece that makes this architectural: ProgressUpdatedEvent fires → engine writes progress state into case context → existing milestone expression evaluation picks it up. A milestone criterion like progress.workitem.abc123.state.value >= 80 works with no new engine machinery. Progress and milestones compose via events — progress tracks continuous state, milestones are binary waypoints that fire when a threshold crosses.

The conversation renderer in casehub-blocks is the other natural consumer. A case worker viewing a channel sees “Calibration: sensor 3 of 7” or “Review: 63% complete” derived from the actual ProgressInstance state — not parsed from messages, not a number someone typed in manually. The choreography overlay that blocks#62 has been waiting for.

The step DAG model also gives AI agents a structured reporting surface. An agent processing 50 files can report {current: 23, total: 50, unit: "files"} at each step, feeding naturally into trust scoring and SLA monitoring. The agent doesn’t need to know about the progress model’s internals — it’s a REST call with a JSON body.


<