The progress documents were three weeks stale. PROGRESS.md and the Gastown analysis were both dated 2026-05-02, and a significant amount of foundation work had shipped since. We fixed that by dispatching five separate Claudes — each one assigned two or three repos, scanning closed issues, reporting back. The results landed within minutes.

P0 is complete. All of it. The ClaudonyInstanceActorIdProvider that maps ephemeral Claude session IDs to persona format — claude:analyst@v1 — shipped in claudony#107 on May 3rd. Trust now accumulates per persona across sessions rather than resetting every time a new tmux session opens. The normative feedback loop is structurally correct end-to-end: COMMAND dispatch → commitment lifecycle → attestations → trust scoring.

And then nothing happens with those scores.

P1.3 — injecting WorkerSelectionStrategy into WorkOrchestrator so trust scores influence who receives work — is unstarted. Two prerequisites have since been filed: engine#336 (SelectionContext carries no trust field, so a strategy can’t read scores even if one existed) and engine#337 (WorkOrchestrator hard-codes LeastLoadedStrategy rather than resolving via CDI). On top of that, qhorus#199 found that TrustGateService is never called at COMMAND creation — obligations open unconditionally regardless of trust score. The trust pipeline produces correct data. None of it affects routing.

The ledger moved further than I expected. Ed25519 bilateral signing landed in mid-May — both sides now sign, making the audit trail non-repudiable in a way that Dolt’s admin-trusted history can’t match. Trust export/import (P2.1) shipped May 14th, closing the Gastown Wasteland parity gap. The key difference: what CaseHub exports is derived from cryptographically attested commitment outcomes rather than human-curated stamps, which is a meaningful distinction if you care about what “reputation” actually means.

The question came up directly: are we almost there? My honest answer is around 30%.

The foundation infrastructure is in better shape than I’d realised — P0 complete, most of P2 done. But the application is at Layer 2 of 7, trust routing is decorative until P1.3 and qhorus#199 land, the merge queue hasn’t been started, and the operational reliability layer — throttle, watchdog recovery — is untouched. The 30% is real work. The remaining 70% isn’t just typing.

With the docs current, we ran through the small open issues. Two were already resolved and just needed closing: evalObjectTemplate was gone from MapCaseContext, the duplicate endpoint conflict had been fixed by qhorus#172. Two needed actual changes: removing the qhorus reactive pool suppression from test properties (qhorus#141 shipped, making it unnecessary), and adding doesNotFire_whenAlreadyDone tests for test-coverage and performance-analysisstyle-check had the test, the other two parallel checks were missing it. Tidying the attic.


<